Warning: Undefined array key "options" in /home/u479411274/domains/govtjobaware.com/public_html/wp-content/plugins/elementor-pro/modules/theme-builder/widgets/site-logo.php on line 192

Government job Notification | Government Schemes | Result | Admit Card

 Farmer oriented solar power scheme ( किसान आधारित सोलर उर्जा योजना है )

Launch date– july 2019

Launched by – ministry of new and renewable energy (MNRE)

Target old – 25750 MW up to 2022 from 27.5 lakh pump installation

              new – 30.8 GW  2022 from 35 lakh pump installation

Budget – 34422 cr

Subsidy – 30% central govt / 30% state govt / 30% bank

Main point – 

Setting up 10000MW of decentralised ground/ silt  mounted grid connected solar or other renewable energy based power plants (विकेन्द्रीकृत जमीन / गाद सवार ग्रिड से जुड़े 10000MW सौर या अन्य नवीकरणीय ऊर्जा आधारित बिजली संयंत्रों की स्थापना)

installation of 17.5 lakh (new target – 20 lakh) off grid stand alone solar ag pumps (17.5 लाख की स्थापना (नया लक्ष्य – 20 लाख) अकेले ऑफ-ग्रिड सौर कृषि पंपों की स्थापना)

solarisation of 10 lakh ( new target – 15 lakh ) grid connected ag pumps 7.5 hp( 10 लाख का सोलराइजेशन (नया लक्ष्य – 15 लाख) ग्रिड से जुड़ा कृषि पंप 7.5 hp)

More job notification

Leave a Reply

Your email address will not be published. Required fields are marked *